DCMP 07 27 2011

Made a run to Tysons last evening

Contractor has begun construction of the yard lead tunnel west of the Connector Road. 4 segments of invert slab are done. 2 segments of track bed slab are in place on the invert slab on the east end

One span in the Tysons East (McLean) station still needs to be set

It appears that the segments use to assemble the spans over the Capitol Beltway VA I-495 do not add up to a multiple of the total length of a span. They are setting forms in the remaining gap to pour in place the segment that is shorter then the precast segments that are being made at the post tension segment casting plant. From what I could see there are no expansion joints in the combined spans over the Beltway

Lifting gantry #2 was reassembled west of the Tysons Central 7 (Greensboro) station in the middle of July and started working west

They were unloading more segments along Leesburg Pike

The columns that will support the mezzanine in the Tysons Central 7 (Greensboro) station were partly completed.

Notice signal head for new interlocking.

Originally published 07 28 2011
Edited 05 05 2012

K and N Junction:
K and N Junction track laying operations outbound track N2.
Signal heads east end of yest to be installed double crossover east of K and N Junction.

Track construction continues west of K and N junction.
N Route Silver line flyover east of West Falls Church Station:
Concrete ties track N2 east abutment of VA I-66 K route flyover.

Post-tension lifting gantry #2
Post-tension lifting gantry #2 west of Tysons Central 7 (Pike Seven Plaza). "Post-tension lifting gantry #2 west of Tysons Central 7 (Pike Seven Plaza). Post-tension lifting gantry #2 west of Tysons Central 7 (Pike Seven Plaza).
Post-tension lifting gantry #2 west of Tysons Central 7 (Pike Seven Plaza). Post-tension lifting gantry #2 west of Tysons Central 7 (Pike Seven Plaza). Cut and cover east of Tysons Central 7 (Pike Seven Plaza)Post?-tension lifting gantry #2.
Post-tension lifting gantry #1 East end Tysons East (Tysons McLean).

Precast concrete post-tension bridge segments:
Unloading of post-tension segment Leesburg Pike between Tysons Central 7 (Pike Seven Plaza) and Tysons West (Spring Hill Road) stations. Unloading of post-tension segment Leesburg Pike between Tysons Central 7 (Pike Seven Plaza) and Tysons West (Spring Hill Road) stations. Post-tension segment staged along Leesburg Pike between Tysons Central 7 (Pike Seven Plaza) and Tysons West (Spring Hill Road) stations.
Post-tension segment staged along Leesburg Pike between Tysons Central 7 (Pike Seven Plaza) and Tysons West (Spring Hill Road) stations.

Falls Church Yard lead tunnel:
Track bed slab for Falls Church Yard lead tunnel west of VA-267 Dulles Connector Road.

The Tysons Central 7 (Pike Seven Plaza) station is starting to come up out of the ground.

Tysons Central 7 (Greensboro) station:
Mezzanine columns Tysons Central 7 (Greensboro) station.


Pictures at picasaweb.google.com/cambronj 07 27 2011