5/05/2012

DCMP 10 15 2011

All of the trackwork in the junction is in place. Inbound junction turnout 07 16, 17 2011 outbound turnout 07 23, 24 2011. The double crossover to the east was installed 09 03, 05 2011. Third rail has been installed from the junction west to the west end of the flyover on outbound track N2 and several hundred feet short on track N1. Looks like all of the train control ground equipment for double crossover and on the K route tracks through the junction are in place. Those that are being used are connect to the West Falls Church K06 train control room. The contractor building the new K98 junction train control room next to the Fisher Avenue substation were working on the foundation for the building. Funny how all of the track work and related ground equipment for the junction is in place with nothing to connect it to.

Lifting gantry #1 is now working west of Capitol One Drive in the Tysons East (McLean) station. The gantry is positioned between the trackways over the center of the columns supporting the elevated structure at the west end of the station. It is still working the trackway spans through the station. Only 4 spans are left to be assembled, 2 on each track. The steel for the mezzanine is in place. About 2/3 of the concrete beams for the station platform are in place.

Most of the spans in the Tysons East (McLean) and Tysons Central 123 (Tysons Corner) stations were assembled on the ground and lifted into place with a crane.

Lifting gantry #2 is now working west of Gosnell Road / Westpark Drive. It crawled over the intersection of Leesburg Pike and Gosnell Road / Westpark Drive as those spans have fixed bearings similar to the spans over the Capitol Beltway VA I-495 and are being assembled using a crane.

Only a hand full of segments need to be set in the spans over the Gosnall / WestPark Leesburg Pike intersection, outbound track N2 4, inbound track N1 2 east of the intersection, 4 outbound track N2, 3 inbound track N1 west of the intersection and 5 outbound track N2, 3 inbound track N1 over the intersection.

Lifting gantry #3 broke down in late June after completing most of the spans for inbound track N1. It was inactive until July when it was put back service and completed the remainder spans. It was moved over to outbound track N2 and set several segments of the span over the interloop of the Capitol Beltway VA I-495 before breaking down again in August. It has been disassembled and removed from the site and the remainder of the spans are being assembled by conventional means using one of the tracked cranes.

It should be noted now that there a total of 16 spans the have fixed bearings. The spans over Capitol Beltway VA I-495 are continuious units composed of 5 spans that have 2 fixed bearings and 2 expansion bearings. The spans over the Leesburg Pike and Gosnell Road / Westpark Drive intersection are continuious units composed of 3 spans on 2 fixed bearings. The spans from the straddle bent over the Dulles Access Road to the median of the Dulles Access Road west of Leesburg Pike VA-7 are continuious units composed of 2 spans on 1 fixed bearing. The remander of the spans, including the spans in the elevated stations, are single unit spans bearing on 2 columns or on 1 column and 1 abutment.

The concrete beams for the station platform in the (Tysons Central 123) Tysons Corner station are only done from the west end of the station to the east side of Tysons Boulevard. The contractor has begun clearing the area at Tysons Corner Ring Road and Tysons Boulevard for the station entrance and pedestrian bridge on the south side Chain Bridge Road that will connect the mall to the station.

The cut and cover tunnels from the bored tunnel east of the Tysons Central 7 (Greensboro) station are almost complete. Only one segment of the platform slab at the west end remains to be poured, the next to last segment was poured early that morning.

The straddle bent over eastbound Leesburg Pike still has the forms in place. All of the column west of the Leesburg Pike straddle bent and straddle bents over the Dulles Access and Toll Road are done The column west of the straddle bent over the Dulles Access Road is a cantilever span column. The footings west of the abutment are being readied for the retaining walls.

Most of the barrier walls between Leesburg Pike and Wiehle are in place. Most of the places where they are not in place is where ground work for the traction power conduits is being installed from the substation and at the interlockings.

Structural work at Wiehle Avenue is done. Precast concrete panels for the station facade have been delivered. The first one was set at the east end of the station on the north outbound side. The architectural design, texture and color of the panels bares no resemblance to the station renderings. In my opinion what being installed looks better then what is shown in those rendering. The dispatcher office at the west end of the platform has the same texture and color as the precast concrete facade panels.

For those that own a Nikon DSLR, file names roll over to DXX_0001.* after DXX_9999.* .

Originally published 10 22 2011
Edited 05 05 2012

K and N junction:
New double crossover east of Great Falls Street. New double crossover east of Great Falls Street.
New double crossover east of Great Falls Street.
New ground equipment east of Great Falls Street. Junction turnouts west of Great Falls Street. West of Great Falls Street.
Junction east of Great Falls Street.

VA I-66 Flyover:
K Route and VA I-66 flyover. VA I-66 flyover east abutment track N2. K Route and VA I-66 flyover.
VA I-66 flyover east abutment track N2.
Tie tamper east of K Route and VA I-66 flyover track N1. Tie tamper east of K Route and VA I-66 flyover track N1.
VA I-66 flyover east abutment track N2.

Falls Church Yard lead:
Falls Church lead west of Dulles Connector Road VA-267. Falls Church lead west of Dulles Connector Road VA-267. Falls Church Yard lead tunnel invert.
Falls Church Yard lead west portal, K Route and VA I-66 flyovers. Falls Church Yard lead west portal. Falls Church Yard lead west portal.
Falls Church Yard lead west portal, K Route and VA I-66 flyovers. Falls Church Yard lead between west abutments of K Route and VA I-66 flyover. West abutment K Route and VA I-66 flyover track N2.

North abutment VA I-66 Flyover, Falls Church Yard lead junction:
West abutment K Route and VA I-66 flyover track N2. West abutments K Route and VA I-66 flyover. West abutments K Route and VA I-66 flyover.
West abutments, K Route and VA I-66 flyover. Falls Church Yard lead, west abutments, K Route and VA I-66 flyover. Falls Church Yard lead, west abutments, K Route and VA I-66 flyover.
Falls Church Yard lead, west abutments, K Route and VA I-66 flyover. Plainfield Street Traction power substation. Plainfield Street Traction power substation, K97 Falls Church Yard lead train control room.

Dulles Connector Road VA-267:
Dulles Connector Road VA-267 west of Idylwood Road. Dulles Connector Road VA-267 west of Idylwood Road. Dulles Connector Road VA-267 South of Magarity Road.
Dulles Connector Road VA-267 South of Magarity Road. Dulles Connector Road VA-267 east abutment south of Old Chain Bridge Road. VA-267 Dulles Access, Connector Road and Dolley Madison Boulevard VA-123.
VA-267 Dulles Access, Connector Road and Dolley Madison Boulevard VA-123.

Dolley Madison Boulevard VA-123 between Dulles Connector Road VA-267 and Scotts Crossing Road:
VA-267 Dulles Access, Connector Road and Dolley Madison Boulevard VA-123. Dolley Madison Boulevard VA-123 west of Anderson Road. VA-267 Dulles Access, Connector Road and Dolley Madison Boulevard VA-123.
VA-267 Dulles Access, Connector Road and Dolley Madison Boulevard VA-123. Dolley Madison Boulevard VA-123 west of Anderson Road, N02 interlocki?ng west of Anderson Road. VA-267 Dulles Access, Connector Road and Dolley Madison Boulevard VA-123, N02 interlocking west of Anderson Road.
Dolley Madison Boulevard VA-123 and Scotts Crossing Road. Dolley Madison Boulevard VA-123 east of Scotts Crossin Road. Post-tension cantilever span segment on trailer at Scotts Crossing Road.
Post-tension cantilever span segment on trailer at Scotts Crossing Road.

Tysons East (McLean) station:
East end of Tysons East (Tysons McLean) station. East end of Tysons East (Tysons McLean) station. East end of Tysons East (Tysons McLean) station.
Mezzanine to platform alevators Tysons East (Tysons McLean) station. Openings for mezzanine to platform escalators Tysons East (Tysons McLean) station. East end of Tysons East (Tysons McLean) station.
Ancillary area below mezzanine Tysons East (Tysons McLean) station. Ancillary area below mezzanine Tysons East (Tysons McLean) station. East end of Tysons East (Tysons McLean) station.
East end of Tysons East (Tysons McLean) station. Mezzanine east end of Tysons East (Tysons McLean).

Post-tension lifting gantry #1:
Lifting Gantry #1 at Capitol One Drive, Tysons East (Tysons McLean). Lifting Gantry #1 at Capitol One Drive, Tysons East (Tysons McLean). Lifting Gantry #1 at Capitol One Drive, Tysons East (Tysons McLean).
Lifting Gantry #1 at Capitol One Drive, Tysons East (Tysons McLean).
Lifting Gantry #1 at Capitol One Drive, Tysons East (Tysons McLean).
Lifting Gantry #1 at Capitol One Drive, Tysons East (Tysons McLean).
Tysons East (Tysons McLean) at Capitol One Drive. Tysons East (Tysons McLean) at Capitol One Drive. Lifting Gantry #1 at Capitol One Drive, Tysons East (Tysons McLean).
Lifting Gantry #1 at Capitol One Drive, Tysons East (Tysons McLean). Lifting Gantry #1 at Capitol One Drive, Tysons East (Tysons McLean). Lifting Gantry #1 at Capitol One Drive, Tysons East (Tysons McLean)
Lifting Gantry #1 at Capitol One Drive, Tysons East (Tysons McLean). Lifting Gantry #1 at Capitol One Drive, Tysons East (Tysons McLean). Lifting Gantry #1 at Capitol One Drive, Tysons East (Tysons McLean).
Lifting Gantry #1 at Capitol One Drive, Tysons East (Tysons McLean). Dolley Madison Boulevard VA-123 east of VA I-495 Capitol Beltway Lifting Gantry #1 at Capitol One Drive, Tysons East (Tysons McLean).

Capitol Beltway VA I-495 Dolly Madison Boulevard VA-123 interchange:
Dolley Madison Boulevard VA-123 east of VA I-495 Capitol Beltway. Cantilevered spans over VA I-495 Capitol Beltway at Dolley Madison Boulevard VA-123. Cantilevered spans over VA I-495 Capitol Beltway at Dolley Madison Boulevard VA-123.
Cantilevered spans over VA I-495 Capitol Beltway at Dolley Madison Boulevard VA-123. Cantilevered spans over VA I-495 Capitol Beltway at Dolley Madison Boulevard VA-123. Cantilevered spans over VA I-495 Capitol Beltway at Dolley Madison Boulevard VA-123.
Cantilevered spans over VA I-495 Capitol Beltway at Dolley Madison Boulevard VA-123. Cantilevered spans over VA I-495 Capitol Beltway at Dolley Madison Boulevard VA-123. Cantilevered spans over VA I-495 Capitol Beltway at Dolley Madison Boulevard VA-123.
Dolley Madison Boulevard VA-123 west of VA I-495 Capitol Beltway.

Tysons Central 123 (Tysons Corner):
Dolley Madison Boulevard VA-123 west of Westpark Drive. Dolley Madison Boulevard VA-123 west of Westpark Drive. Dolley Madison Boulevard VA-123 west of Westpark Drive.
Dolley Madison Boulevard VA-123 west Westpark Drive. Tysons 123 (Tysons Center) station. East end Tysons 123 (Tysons Center) station.
East end Tysons 123 (Tysons Center) station. East end Tysons 123 (Tysons Center) station. West end Tysons 123 (Tysons Center) station.
West end Tysons 123 (Tysons Center) station. Tysons 123 (Tysons Center) station at Tysons Boulevard. East end Tysons 123 (Tysons Center) station.
Tysons 123 (Tysons Center) station at Tysons Boulevard. Tysons 123 (Tysons Center) station at Tysons Boulevard. Tysons 123 (Tysons Center) station.

Cut and over tunnels:
East end Cut and Cover west of Tysons Central 7 (Pike Seven Plaza) station. East end Cut and Cover west of Tysons Central 7 (Pike Seven Plaza) station. East end Tysons Central 7 (Pike Seven Plaza) station.
Cut and cover east of Tysons Central 7 (Pike Seven Plaza) station. Cut and cover, Tysons Central 7 (Pike Seven Plaza) station and elevated.

Tysons Central 7 (Greensboro):
East end of elevated and Tysons Central 7 (Pike Seven Plaza) station. West ancillary area Tysons Central 7 (Pike Seven Plaza) station. Elevated west of Tysons Central 7 (Pike Seven Plaza) station.
Tysons Central 7 (Pike Seven Plaza) station, west ancillary area, east end of elevated and lifting gantry #2. Cut and cover, Tysons Central 7 (Pike Seven Plaza) station, west ancillary area, east end of elevated. Tysons Central 7 (Pike Seven Plaza) station track N2.
East ancillary area Tysons Central 7 (Pike Seven Plaza) station track N2. East ancillary area Tysons Central 7 (Pike Seven Plaza) station track N2. Elevated west of East ancillary area Tysons Central 7 (Pike Seven Plaza) station lifting gantry #2.
Tysons Central 7 (Pike Seven Plaza) station track N2. Tysons Central 7 (Pike Seven Plaza) station. Tysons Central 7 (Pike Seven Plaza) station track N2.
Tysons Central 7 (Pike Seven Plaza) station. Tysons Central 7 (Pike Seven Plaza) station. Tysons Central 7 (Pike Seven Plaza) station, concrete just poured near west end of platform.
Tysons Central 7 (Pike Seven Plaza) station, concrete just poured near west end of platform. Tysons Central 7 (Pike Seven Plaza) station, concrete just poured near west end of platform. Traction power substation and west ancillary area Tysons Central 7 (Pike Seven Plaza) station.
Traction power substation and west ancillary area Tysons Central 7 (Pike Seven Plaza) station. Traction power substation and west ancillary area Tysons Central 7 (Pike Seven Plaza) station. Elevated west of Tysons Central 7 (Pike Seven Plaza) station.
Elevated and west ancillary area Tysons Central 7 (Pike Seven Plaza) station. West abutment west of Tysons Central 7 (Pike Seven Plaza) station. Traction power substation and west ancillary area Tysons Central 7 (Pike Seven Plaza) station.

Gosnell Road / Westpark Drive intersection:
Leesburg Pike at Gosnell Road / Westpark Drive. Leesburg Pike at Gosnell Road / Westpark Drive. Leesburg Pike at Gosnell Road / Westpark Drive.
Leesburg Pike east side of Gosnell Road / Westpark Drive intersection. Leesburg Pike west side of Gosnell Road / Westpark Drive intersection. Leesburg Pike west side of Gosnell Road / Westpark Drive intersection.
Leesburg Pike Gosnell Road / Westpark Drive intersection. Leesburg Pike Gosnell Road / Westpark Drive intersection. Leesburg Pike Gosnell Road / Westpark Drive intersection.
Leesburg Pike Gosnell Road / Westpark Drive intersection. Leesburg Pike Gosnell Road / Westpark Drive intersection. Leesburg Pike west side of Gosnell Road / Westpark Drive intersection.
Leesburg Pike Gosnell Road / Westpark Drive intersection. Leesburg Pike west side of Gosnell Road / Westpark Drive intersection. Leesburg Pike east side of Gosnell Road / Westpark Drive intersection.
Leesburg Pike Gosnell Road / Westpark Drive intersection. Leesburg Pike west side of Gosnell Road / Westpark Drive intersection. Leesburg Pike east side of Gosnell Road / Westpark Drive intersection.

Post-tension lifting gantry #2:
Leesburg Pike lifting gantry #2 east of Gosnell Road / Westpark Drive. Leesburg Pike lifting gantry #2 east of Gosnell Road / Westpark Drive. Leesburg Pike lifting gantry #2 east of Gosnell Road / Westpark Drive.
Leesburg Pike lifting gantry #2 east of Gosnell Road / Westpark Drive. Leesburg Pike lifting gantry #2 east of Gosnell Road / Westpark Drive. Leesburg Pike lifting gantry #2 east of Gosnell Road / Westpark Drive.
Leesburg Pike lifting gantry #2 east of Gosnell Road / Westpark Drive, tensioning cables being pulled track N2. Leesburg Pike lifting gantry #2 east of Gosnell Road / Westpark Drive. Leesburg Pike lifting gantry #2 east of Gosnell Road / Westpark Drive.
Leesburg Pike lifting gantry #2 east of Gosnell Road / Westpark Drive. Leesburg Pike lifting gantry #2 east of Gosnell Road / Westpark Drive. Leesburg Pike lifting gantry #2 east of Gosnell Road / Westpark Drive.

Leesburg Pike VA-7, precast concrete post-tension bridge segments staged between Gosnell Road / Westpark Drive and Spring Hill Road:
Lifting gantry #2, post-tension segments. Post-tension segments. Post-tension segments.

Leesburg Pike VA-7 east of Spring Hill Road:
Leesburg Pike west of Spring Hill Road. Leesburg Pike west of Spring Hill Road.

Spring Hill Road (Spring Hill) station:
East end of Tyson West (Spring Hill Road) station. West end of Tyson West (Spring Hill Road) station. Tyson West (Spring Hill Road) station.
Tyson West (Spring Hill Road) station. West end Tyson West (Spring Hill Road) station. East end of Tyson West (Spring Hill Road) station.
Tyson West (Spring Hill Road) station. West end of Tyson West (Spring Hill Road) station. East end of Tyson West (Spring Hill Road) station.
West end of Tyson West (Spring Hill Road) station. West end of Tyson West (Spring Hill Road) station. West end of Tyson West (Spring Hill Road) station.
West end of Tyson West (Spring Hill Road) station.

Leesburg Pike VA-7 to median of Dulles Access Road:
West end of Tyson West (Spring Hill Road) station Leesburg Pike west of Tyco Road / Westwood Center Drive Leesburg Pike west of Tyco Road / Westwood Center Drive
Leesburg Pike west side of Tyco Road / Westwood Center Drive intersection West end of Tyson West (Spring Hill Road) station Leesburg Pike west of Tyco Road / Westwood Center Drive
Leesburg Pike west of Tyco Road / Westwood Center Drive Leesburg Pike west of Tyco Road / Westwood Center Drive Leesburg Pike west of Tyco Road / Westwood Center Drive
Straddle bent over eastbound Leesburg Pike east of Dulles Access and Toll Road Straddle bent over eastbound Leesburg Pike east of Dulles Access and Toll Road Straddle bent over eastbound Leesburg Pike east of Dulles Access and Toll Road
Columns east of Dulles Access and Toll Road Columns east of Dulles Access and Toll Road Columns east of Dulles Access and Toll Road
Straddle bent over Dulles Toll Road west of Leesburg Pike Straddle bent over Dulles Access Road west of Leesburg Pike Straddle bents over Dulles Access and Toll Roads west of Leesburg Pike
Straddle bent over Dulles Access Road west of Leesburg Pike Dulles Access Road west of Leesburg Pike West abutment Dulles Access Road west of Leesburg Pike
West abutment Dulles Access Road west of Leesburg Pike West abutment Dulles Access Road west of Leesburg Pike

Dulles Access Road:
Trap Road looking east Trap Road looking eas Trap Road looking west
Trap Road Road looking west Traction power conduit excavation west of Trap Road Beulah Road looking east
Beulah Road looking east Beulah Road looking east Beulah Road looking west
Beulah Road looking west Wiehle Avenue looking east
Wiehle Avenue looking east

Wiehle Avenue station:
Escalator on trailer Wiehle Avenue
Escalator on trailer Wiehle Avenue
Station facade concrete panels staged east of the Wiehle Avenue station
First station facade concrete panels set at east end of Wiehle Avenue station north track N2 side East ancillary area Wiehle Avenue station Wiehle Avenue station
Wiehle Avenue station
Wiehle Avenue station
Wiehle Avenue station
Wiehle Avenue station Wiehle Avenue station Dispatchers office west end Wiehle Avenue station
Tail track west of Wiehle Avenue station Crain working Reston Station Development north of Wiehle Avenue station (note metro M logo)

Pictures at picasaweb.google.com/cambronj 10 15 1011