All columns for the VA I-66 K Route Orange line flyover have been completed. As of 10 24 2010 11 of the 40 span beams remain to be set. The span are a combination of precast concrete and fabricated steel. 18 on outbound track N1, 8 steel, 10 concrete, 22 on inbound track N1, 7 steel, 15 concrete.

All of the precast concrete beams have been set north of VA I-66 in the VA-267 median. There are 2 on trailers waiting to be set at the east end of outbound bridge.

Steel beam are being used on the spans over westbound VA I-66, the K Route Orange line tracks and over the future yard lead into Falls Church yard from the N Route.

The Contractor has begun pouring the track bed on the west end of precast concrete beams working east.

The bridge over Pitmman Run is complete. Construction of the barrier walls in the median of the Dulles Connector Road VA-267 is well under way. The retaing walls for the fill east of the abutmant east of Old Chain Bridge Road are well under way. All but one set of columns between Old Chain Bridge Road and Scotts Crossing Road are done, a couple still have forms that need to be striped. 9 post-tension spans on Track N2 has progresed from Old Chain Bridge Road to the west, 8 on track N1.

All of the column that will support the Tysons East (McLean) station are up to the mezzanine level, one pair is done, another still has form on it. The single track columns on either side of the station are at various stages of completion, all of the double track columns east of the Capitol Beltway are done.

The contractor has begun to stage the post-tension precast concrete bridge segments on the ground between the columns along Dolly Madison Boulevard VA-123 between Old Chain Bridge Road and Scotts Crossing Road.

All of the column in the Capitol Beltway VA I-495 Chain Bridge Road VA-123 interchange are complete. Only two pairs of columns between the Capitol Beltway interchange and the east end of the Tysons Central 123 (Tysons Corner) station platform remain uncompleted.

The second lifting gantry was assembled between 08 16 and 08 21 on the columns between the entrance and exit ramps of the outer loop of the Capitol Beltway VA I-495 and is working east.

All of the columns that will support the Tysons Central 123 (Tysons Corner) station platform east of Tysons Boulevard are done. The columns that will support the station platform west of Tysons Boulevard are in various stages of completion.

The contractor boring the NATM tunnels broke through on the outbound track N2 tunnel in the excavation at the east end of the cut and cover tunnels in the Chain Bridge Road VA-123 Leesburg Pike VA-7 interchange on 10 20 2010. (See Dulles Corridor Metrorail Project progress update 11 08 2010 (3.21 MB PDF file) for pictures of that) The outbound track N1 tunnel will likely brake through around the end of November.

The lanes of westbound Leesburg Pike VA-7 have been shifted south and the ramps to and from southbound Chain Bridge Road VA-123 have been closed to accommodate the excavation and construction of another length of the outbound track N2 cut and cover tunnel.

Excavation of the platform area at the east end of the Tysons Central 7 (Greensboro) station and the area east of the station has begun. Excavation of the ancillary area and traction power substation west of the station has begun.

Column foundation construction has begun at the Tysons West (Spring Hill) station. Column foundation construction along Leesburg Pike VA-7 for the elevated on either end of the station has not begun.

I am told by others that column foundation construction has begun for the flyover in the Leesburg Pike VA-7 Dulles Toll Road VA-267 interchange, some of the column are in at various stages of completion.

The various bridges in the median of the Dulles Access Road between Leesburg Pike VA-7 and the Wiehle Avenue station are in various stages of completion.

The column that will support the canopy and mezzanine at the Wiehle Avenue station are done along with the some of the walls that will support the platform.

Pictures at picasaweb.google.com/cambronj 06 23 2010

Originally published 10-31-2010
Edited 05 02 2012

VA I-66 Flyover:
Outbound VA I-66, looking west. East abutments, signals control access into the West Falls Church station pocket track. Straddle bent for outbound track N2 over westbound VA I-66, looking west.
Straddle bent for outbound track N2 over westbound VA I-66, looking west. Column between tracks K1 and K3 on the Orange line. Column between tracks K1 and K3 on the Orange line.
VA-267 median, object on left are the concrete forms used to fabricate the straddle bent over westbound VA I-66. VA-267 median, outbound track N2, looking west. VA-267 median, outbound track N2, looking west.
VA-267 median, outbound track N2. background inbound track N1. VA-267 median, outbound track N2, forms for poured in place trackbed, looking west. VA-267 median, outbound track N2, looking west.
Straddle bent for outbound track N2 over westbound VA I-66. VA-267 median, outbound track N2. background inbound track N1, looking east. VA-267 median, outbound track N2. background inbound track N1.
VA-267 median, outbound track N2, forms for poured in place trackbed, looking west. VA-267 median, outbound track N2, forms for poured in place trackbed, looking west. VA-257 median, west abutments, far abutment is inbound track N1, looking west.
VA-257 median, west abutments outbound track N2, trench for Falls Church lead viable to left of abutment, looking east. VA-257 median, west abutments outbound track N2, trench for Falls Church lead viable to left of abutment, looking east. VA-257 median, west abutments inbound track N1, steel beam spans Falls Church lead, looking east.
Inbound track N1 K Route flyover, looking east. Inbound track N1 K Route flyover, looking east. Inbound track N1 VA I-66 and K Route flyover, looking east.
VA-257 median, inbound track N1, looking west. VA-257 median, inbound track N1 left, outbound track N2 right, looking west. VA-257 median, outbound track N2 left, inbound track N1 right, looking east.
VA-257 median, outbound track N2, looking east. VA-257 median, inbound track N1, looking east. VA-257 median, inbound track N1, looking east.
East abutment inbound track N1, K Route and VA I-66 flyover, looking west. K Route and VA I-66 flyover, east abutment outbound track N2, looking west. K Route and VA I-66 Flyover, looking west.
East abutment inbound track N1, K Route and VA I-66 Flyover, looking west. East abutments, looking west. East abutment outbound track N2, looking west, precast concrete beams on trailers.

Dulles Toll Road VA 267 Dolley Madison Boulevard VA-123 interchange:
Barrier walls / retaind fill median VA-267 south of Old Chain Bridge Road, looking north. Barrier walls median VA-267 south of Old Chain Bridge Road, looking south. Barrier walls / retaind fill median VA-267 south of Old Chain Bridge Road, looking north.
Elevated Old Chain Bridge Road, looking south. Barrier walls / retaind fill median VA-267 south of Old Chain Bridge Road, looking north. Straddle bent over eastbound Dulles Access Road.
Elevated Old Chain Bridge Road, looking south. Straddle bent over eastbound Dulles Access Road. Straddle bents over eastbound Dulles Access Road.
Straddle bent over eastbound Dulles Access Road. Straddle bent over eastbound Dulles Access Road (left) Toll Road VA-267 (right), looking west. Straddle bent over eastbound Dulles Access Road (left) Toll Road VA-267 (right), looking west.
Straddle bent over eastbound Dulles Access Road (left) Toll Road VA-267 (right), looking west. Straddle bent over eastbound Dulles Access Road (left) Toll Road VA-267 (right), looking west. Post-tension lifting gantry working outbound track N2 above Dulles Toll Road VA-267, looking west.
Post-tension lifting gantry working outbound track N2 above Dulles Toll Road VA-267, looking south.

Post-tension lifting gantry working outbound track N2, Straddle bent above Dulles Toll Road VA-267, looking south.
Post-tension lifting gantry working outbound track N2 above Dulles Toll Road VA-267, looking east.
Post-tension lifting gantry working outbound track N2 above Dulles Toll Road VA-267, looking east. Post-tension lifting gantry working outbound track N2 above Dulles Toll Road VA-267, looking east. Post-tension lifting gantry working outbound track N2, Straddle bent above Dulles Toll Road VA-267, looking south.
Post-tension lifting gantry working outbound track N2, Straddle bent above Dulles Toll Road VA-267, looking south. Post-tension lifting gantry working outbound track N2, Straddle bent above Dulles Toll Road VA-267, looking south. End segment inbound track N1 between Dulles Access and Toll Roads VA-267, looking south.
End segment inbound track N1 between Dulles Access and Toll Roads VA-267, looking south. Post-tension lifting gantry working outbound track N2 above Dulles Toll Road VA-267, looking east. Straddle bent over eastbound Dulles Access Road, looking east.
Post-tension lifting gantry working outbound track N2, Straddle bent above Dulles Toll Road VA-267, looking north. Post-tension lifting gantry working outbound track N2 above Dulles Toll Road VA-267, looking north. Post-tension lifting gantry working outbound track N2 above Dulles Toll Road VA-267, looking north.
Post-tension lifting gantry working outbound track N2, Straddle bent above Dulles Toll Road VA-267, looking south. Post-tension lifting gantry working outbound track N2, Straddle bent above Dulles Toll Road VA-267 (right) Straddle bents above Dulles Access Road (left), looking south. Straddle bent above Dolley Madison Boulevard VA-123 south of Dulles Access Road / Toll Road interchange, looking south.
Columns, straddle bent above Dolley Madison Boulevard VA-123 south of Dulles Access Road / Toll Road interchange, looking north. Columns, straddle bent above Dolley Madison Boulevard VA-123 south of Dulles Access Road / Toll Road interchange, looking north. Columns, straddle bent above Dolley Madison Boulevard VA-123 south of Dulles Access Road / Toll Road interchange, looking north.
Columns, straddle bent above Dolley Madison Boulevard VA-123 south of Dulles Access Road / Toll Road interchange, looking west. Columns, straddle bent above Dolley Madison Boulevard VA-123 south of Dulles Access Road / Toll Road interchange, looking west. Columns, straddle bent above Dolley Madison Boulevard VA-123 south of Dulles Access Road / Toll Road interchange, looking west.
Post-tension lifting gantry working outbound track N2 above Dulles Toll Road VA-267, straddle bent above Dolley Madison Boulevard VA-123 south of Dulles Access Road / Toll Road interchange, looking north from Tysons Corner Center parking garage E. Post-tension lifting gantry working outbound track N2 above Dulles Toll Road VA-267, straddle bent above Dolley Madison Boulevard VA-123 south of Dulles Access Road / Toll Road interchange, looking north from Tysons Corner Center parking garage E. Post-tension lifting gantry working outbound track N2 above Dulles Toll Road VA-267, looking north from Tysons Corner Center parking garage E.
Post-tension lifting gantry working outbound track N2 above Dulles Toll Road VA-267, straddle bent above Dolley Madison Boulevard VA-123 south of Dulles Access Road / Toll Road interchange, Tysons East (McLean) station lower left, looking north from Tysons Corner Center parking garage E.

Dolley Madison Boulevard VA-123 between Anderson Road and Scotts Crossing Road, precast concrete post-tension bridge segments:
Straddle bent form over Dolly Madison Boulevard VA-123, columns between Anderson Road and Tysons East (Mclean) station, east end of Tysons East (Mclean) station. Columns along north side of Dolly Madison Boulevard VA-123 from straddle bent above Dolley Madison Boulevard VA-123 south of Dulles Access Road / Toll Road interchange to Scotts Crossing Road, looking west. Columns east of exit / entrance ramp VA-267 at Old Chain Bridge Road and Dolly Madison Boulevard VA-123, looking east.
Columns along north side of Dolly Madison Boulevard VA-123 between Old Chain Bridge Road and Scotts Crossing Road, looking west, Crains in distance working at east end of Tyson East (McLean) station. Columns along north side of Dolly Madison Boulevard VA-123 between Old Chain Bridge Road and Scotts Crossing Road, looking west, precast concrete post-tension bridge segments. Columns along north side of Dolly Madison Boulevard VA-123 between Old Chain Bridge Road and Scotts Crossing Road, looking west, precast concrete post-tension bridge segments.
Intermediate precast concrete post-tension bridge segments, segments with exposed rebar on one side for spans under double crossover. Inside intermediate precast concrete post-tension bridge segments, numbering code used to identify segment location. Precast concrete post-tension bridge segments, segments with exposed rebar on one side for spans under double crossover.
Precast concrete post-tension bridge segments, segments with exposed rebar on one side for spans under double crossover. Inside intermediate precast concrete post-tension bridge segments, tensioning cables pass through the six holes. Back side of precast concrete post-tension bridge barring end segment, tensioning cables pass through tubes.
Front side of precast concrete post-tension bridge barring end segment, end of tensioning cables wedged in six holes. Front side of precast concrete post-tension bridge barring end segment, end of tensioning cables wedged in four holes. Front side of precast concrete post-tension bridge barring end segment.
Inside intermediate precast concrete post-tension bridge segments, tensioning cables pass through the six holes. Front side of precast concrete post-tension bridge barring end segment, end of tensioning cables wedged in six holes. Intermediate precast concrete post-tension bridge segments, segments with exposed rebar on one side for spans under double crossover.
Inside intermediate precast concrete post-tension bridge segments, tensioning cables pass through the six holes. Intermediate precast concrete post-tension bridge segments, tensioning cables pass through the six holes. Precast concrete post-tension bridge segments, segments with exposed rebar on one side for spans under double crossover, slots for third rail conduit supporting brackets.
Precast concrete post-tension bridge segments, segments with exposed rebar on one side for spans under double crossover, slots for third rail conduit supporting brackets.

Tysons East (McLean) station:
Columns along north side of Dolly Madison Boulevard VA-123 east of Scotts Crossing Road, looking south. Columns along north side of Dolly Madison Boulevard VA-123 east of Scotts Crossing Road, looking east. Rebar cage for outbound track N2 column east of Tyson East (McLean) station on west side of Scotts Crossing Road, looking west, Tyson East (McLean) station in back ground.
Forms for inbound track N1 (left), rebar cage for outbound track N2 (right) east of Tyson East (McLean) station on west side of Scotts Crossing Road, looking west, Tyson East (McLean) station in back ground. Forms for inbound track N1 east of Tyson East (McLean) station on west side of Scotts Crossing Road, looking west, Tyson East (McLean) station in back ground. Forms for inbound track N1 (left), rebar cage for outbound track N2 (right) east of Tyson East (McLean) station on west side of Scotts Crossing Road, looking west, Tyson East (McLean) station in back ground.
Columns Tyson East (McLean) station looking east. Columns Tyson East (McLean) station looking east, cross beam support station mezzanine. Columns Tyson East (McLean) station looking east.
Columns Tyson East (McLean) station looking north. Columns Tyson East (McLean) station looking east. Columns Tyson East (McLean) station looking east.
Columns west of Tyson East (McLean) station at Capitol One Drive, looking west. parking structure on right is on Capitol One Bank's property.

Chain Bridge Road VA-123 Capitol Beltway VA I-495 interchange:
Column west of Tyson East (McLean) station, looking north. crossroad to left is temporary on ramp to outerloop of Capitol Beltway VA I-495 from northbound Dolly Madison Boulevard VA-123 that is part of the Capitol Beltway HOT lanes project. Column west of Tyson East (McLean) station east of Capitol Beltway VA I-495, looking north. Column west of Tyson East (McLean) station east of Capitol Beltway VA I-495, looking north.
Column west of Tyson East (McLean) station east of Capitol Beltway VA I-495, looking north. Lifting gantry #2 working the outbound track N2 span over the ramp from southbound Chain Bridge Road to southbound Capitol Beltway VA I-495 outerloop, looking west. Lifting gantry #2 working the outbound track N2 span over the ramp from southbound Chain Bridge Road to southbound Capitol Beltway VA I-495 outerloop, looking south.
Lifting gantry #2 working the outbound track N2 span over the ramp from southbound Chain Bridge Road to southbound Capitol Beltway VA I-495 outerloop, looking south. Lifting gantry #2 working the outbound track N2 span over the ramp from southbound Chain Bridge Road to southbound Capitol Beltway VA I-495 outerloop, looking south. Lifting gantry #2 working the outbound track N2 span over the ramp from southbound Chain Bridge Road to southbound Capitol Beltway VA I-495 outerloop, looking south.
Lifting gantry #2 working the outbound track N2 span over the ramp from southbound Chain Bridge Road to southbound Capitol Beltway VA I-495 outerloop, looking east. Lifting gantry #2 working the outbound track N2 span over the ramp from southbound Chain Bridge Road to southbound Capitol Beltway VA I-495 outerloop, looking east. Both lifting gantries #2 seen from parking garage D Tysons Corner Center. The lifting gantry #1 in background is working the outbound track N2 span over eastbound VA-267 Dulles Connector Road. Lifting gantry #2 in foreground is working the outbound track N2 span over the ramp from southbound Chain Bridge Road to southbound Capitol Beltway VA I-495 Outerloop.
Lifting gantry working the outbound track N2 span over the ramp from southbound Chain Bridge Road to southbound Capitol Beltway VA I-495 outerloop, looking north from parking garage E Tysons Corner Center. Lifting gantry #2 working the outbound track N2 span over the ramp from southbound Chain Bridge Road to southbound Capitol Beltway VA I-495 outerloop, looking north from parking garage E Tysons Corner Center. Lifting gantry #2 working the outbound track N2 span over the ramp from southbound Chain Bridge Road to southbound Capitol Beltway VA I-495 outerloop, looking north from parking garage E Tysons Corner Center.
Staggered columns between Capitol Beltway VA I-495 roadways, looking east. Staggered columns between Capitol Beltway VA I-495 roadways, looking north from parking garage E Tysons Corner Center. Staggered columns between Capitol Beltway VA I-495 roadways, looking north from parking garage E Tysons Corner Center.
Lifting gantry #2 working the outbound track N2 span over the ramp from southbound Chain Bridge Road to southbound Capitol Beltway VA I-495 outerloop, looking north from parking garage E Tysons Corner Center. Excavation for ancillary area and traction power substation west end of Tysons Central 123 (Tysons Center) station, looking west from from parking garage E Tysons Corner Center. West end of Tysons Central 123 (Tysons Center) station above Tysons Boulevard, looking west from from parking garage E Tysons Corner Center.
West end of Tysons Central 123 (Tysons Center) station above Tysons Boulevard, looking west from parking garage E Tysons Corner Center. Columns between Tysons Central 123 (Tysons Center) station and Capitol Beltway VA I-495 interchange, looking north from parking garage E Tysons Corner Center. Lifting gantry #2 working the outbound track N2 span over the ramp from southbound Chain Bridge Road to southbound Capitol Beltway VA I-495 outerloop, staggered columns between roadways, looking north from parking garage E Tysons Corner Center.
Staggered columns between Capitol Beltway VA I-495 roadways, looking north from parking garage E Tysons Corner Center. Lifting gantry #2 working the outbound track N2 span over the ramp from southbound Chain Bridge Road to southbound Capitol Beltway VA I-495 outerloop, staggered columns between roadways, looking north from parking garage E Tysons Corner Center. Staggered columns between Capitol Beltway VA I-495 roadways, looking north from parking garage E Tysons Corner Center.
Staggered columns between Capitol Beltway VA I-495 roadways, looking north from parking garage E Tysons Corner Center. Staggered columns between Capitol Beltway VA I-495 roadways, looking north from parking garage E Tysons Corner Center. Lifting gantry #2 working the outbound track N2 span over the ramp from southbound Chain Bridge Road to southbound Capitol Beltway VA I-495 outerloop, looking east from parking garage D Tysons Corner Center.

Tysons Central 123 (Tysons Corner) station:
Columns east of Tysons Central 123 (Tysons Center) station, looking west. Columns east of Tysons Central 123 (Tysons Center) station, looking west. Columns east of Tysons Central 123 (Tysons Center) station, looking west.
Columns east of Tysons Central 123 (Tysons Center) station, looking west. Columns east of Tysons Central 123 (Tysons Center) station, looking north. Columns east of Tysons Central 123 (Tysons Center) station, looking north.

Cut and cover tunnel trenches in Leesburg Pike VA-7 Chain Bridge Road VA-123 interchange:
Cut and cover outbound track N2 east of the Tysons Central 7 (Greensboro) station, looking west. Cut and cover outbound track N2 east of the Tysons Central 7 (Greensboro) station, looking east.
Cut and cover outbound track N2 east of the Tysons Central 7 (Greensboro) station, looking east.
Cut and cover excavation trenches, outbound track N2 left inbound track N1 right, looking east. Cut and cover excavation trenches, outbound track N2 left inbound track N1 right, looking east from temporary median of Leesburg Pike VA-7, piles lower right are for the south side of the cut and cover tunnel inbound track N1.

Tysons Central 7 (Greesboro) station:
Cut and cover excavation trench east end Tysons Central 7 (Greensboro) station, looking west. Cut and cover excavation trench east end Tysons Central 7 (Greensboro) station, looking west. Cut and cover excavation trench east end Tysons Central 7 (Greensboro) station, looking west.
Cut and cover excavation trench east end Tysons Central 7 (Greensboro) station, looking west. East end Tysons Central 7 (Greensboro) station, piles for the south side of the cut and cover tunnel inbound track N1, looking west. Cut and cover excavation trench east end Tysons Central 7 (Greensboro) station, looking west.
Site of Tysons Central 7 (Greensboro) station, looking east. Rebar cage for column foundation in area west of the Tysons Central 7 (Greensboro) station, looking north. Area west of the Tysons Central 7 (Greensboro) station, looking west.
Cut and cover excavation trench east end Tysons Central 7 (Greensboro) station (lower left) excavation for ancillary area and traction power substation west of the station (lower center), Tysons West (Spring Hill Road) station in background, looking west. Cut and cover excavation trench east end Tysons Central 7 (Greensboro) station (lower left) excavation for ancillary area and traction power substation west of the station (lower center), Tysons West (Spring Hill Road) station in background, looking west. Excavation trench for cut and cover and platform area east end Tysons Central 7 (Greensboro) station, looknig east.
Excavation trench for cut and cover and platform area east end Tysons Central 7 (Greensboro) station, excavation for ancillary area and traction power substation west of the station, looking east. West end of Tysons Central 7 (Greensboro) station east of Gosnell Road / Westpark Drive and Leesburg Pike VA-7 intersection, looking east. Excavation trench for cut and cover and platform area east end Tysons Central 7 (Greensboro) station, looking east.
Excavation for ancillary area and traction power substation west of Tysons Central 7 (Greensboro) station, looking east.

Tysons West (Spring Hill) station:
Leesburg Pike VA-7 west of Gosnell Road / Westpark Drive, looking west. Column foundation construction at Tysons West (Spring Hill Road) station, looking west.

Wiehle Avenue station:
Outbound side Wiehle Avenue station, looking west. Outbound side Wiehle Avenue station, looking west. Wiehle Avenue station, looking west.
Inbound side Wiehle Avenue station, looking west. Wiehle Avenue station, looking west. Outbound side Wiehle Avenue station, looking west.